Decking Sheet Connections Details
![](https://www.claddingsteel.com/wp-content/uploads/2019/09/decking-sheet-connection-new1.jpg)
Cladding fixing detail: The accessories are added as per design requirement
![](https://www.claddingsteel.com/wp-content/uploads/2019/09/decking-sheet-connection-new2.jpg)
End details-flush type: standard end closure detail adopted for steel frame structure
![](https://www.claddingsteel.com/wp-content/uploads/2019/09/decking-sheet-connection-new3.jpg)
End details-option 1: details adopted for cantilever end projections
![](https://www.claddingsteel.com/wp-content/uploads/2019/09/decking-sheet-connection-new4.jpg)
End details-option 1: Alternate details for structures where projections are necessary
![](https://www.claddingsteel.com/wp-content/uploads/2019/09/decking-sheet-connection-new5.jpg)
Butt joint details: standard joint details for continuous casting of slab
![](https://www.claddingsteel.com/wp-content/uploads/2019/09/decking-sheet-connection-new6.jpg)
Temporary support details(if required) : Cladding profile spans longer than conventional system where possibility of temporary support is less
![](https://www.claddingsteel.com/wp-content/uploads/2019/09/decking-sheet-connection-new7.jpg)
Corner details: the ends are closed to make sure the concrete slurry takes the required shape quickly
Concrete Connection details
![decking-sheet-connection](https://www.alfapebltd.com/images/products/decking-sheet-connection-new8.jpg)
Concrete fixing details: The casting of beam & slab is done simultaneously. This saves time and brings economy.